Southeast Transmission Main
Project Overview


An aerial view of the Fairbairn Water Treatment Plant

The Southeast Transmission Main Project involves three key components:

  • Designing and constructing a pipeline to ensure dependable, high-quality drinking water for residents of southeastern Sacramento area
  • Transporting water from the Fairbairn Water Treatment Plant to southeast Sacramento
  • Involving local residents and businesses to help the project team determine the best possible alignment

The City of Sacramento Department of Utilities (DOU) is currently evaluating several proposed alignments for the Southeast Transmission Main Project. DOU is using the following the criteria to help in its selection process:

  • Control project costs
  • Provide safe access for pipeline maintenance and operations
  • Utilize existing right of way
  • Minimize utility conflicts
  • Find most suitable soils
  • Minimize traffic impacts
  • Minimize environmental impacts
  • Collect public input

Additionally, the City and DOU will collaborate with residents and business owners to select the most appropriate alignment. If you are interested in additional information or would like to speak with a project representative, click here.

Project Timeline